Spring 2013 Nortech Marine was given the contract to paint the trawler Adenia LK193 from truck to waterline.
Case Studies
Ex-Whalers Monument
The Ex-whalers Association and Enviroglass commissioned Nortech Marine to assist them in finishing a monument to the whalers planned for the Victoria Pier in Lerwick.
Gas Turbine Exhaust Stack
The steel was blasted to SA3 (all rust and traces removed) and then coated with heat resistant paint which can stand a temperature of 540 cel.
LPA Greenhead Quay Extension
Extension of all the round piles needed to suspend the concrete deck.
New Council Snow Ploughs
Nortech won the contract to build three new snow ploughs.
NHS Chimney Removal, Shetland
Nortech Marine Ltd won the contract to remove a redundant 50ft chimney from NHS Monfield in Lerwick, Shetland.
Ongoing Work at the SSE
General fabrication and painting work is ongoing at Lerwick Power Station.
SGP Steel Beams
Nortech recently altered steel beams for the Shetland Gas Plant.
Sicim Gas Pipeline works at Sullom Voe, Shetland
Nortech Marine won a contract to blast and paint the import lines to Total's Shetland Gas Plant. The work was carried out in very challenging enviromental conditions, starting in November 2011.
Valiant Rebuild
An old salmon workboat was purchased in 2005 to repair for use as a company workboat. It was built in 1978 and had had a hard life with most of the steelwork either damaged or rusted.
Victoria Pier Fender Replacement
Nortech Marine was sucessful in winning a contract to remove and replace Fenders along the West face of the Victoria Peir in Lerwick.
Vidlin Linkspan Repair
Nortech carried out work to the Vidlin linkspan.
Tall Ships Pontoons
Nortech marine is currently blasting and painting large floating pontoons which will be launched for use at the Tall ships event in Lerwick
3000 Tonne Tank
Nortech Marine secured a contract in summer 2008 to refurbish one of two 3000 tonne bulk storage tanks at Scottish and Southern Energy's Lerwick station as part of their scheduled maintenance programme. In 2013 we won the contract to do the remaining storage tank.